# Roadmap Living index of open work. **Pin [#167](https://github.com/mihaelamj/PureXML/issues/167)** on GitHub for the checklist view. Released **v0.2.0** (2026-06-16); pre-1.0 until the production-readiness gates in `docs/production-readiness.md` are earned. ## Current focus (priority order) 1. **#161**: cross-document schema composition (`include`/`import`/`redefine`): chameleon include + cross-container reference checks landed; attg/schZ XSTS burn-down still open. 2. **#158 / #159**: Particle Valid Restriction/Extension completion. 3. **#169**: located schema diagnostics (line/column). 4. **#172–#174**: instance-validation cluster tasks. Parallel: **#130** (XSLT suite), **#139** (performance epic; tasks [#175](https://github.com/mihaelamj/PureXML/issues/175)–[#178](https://github.com/mihaelamj/PureXML/issues/178)). **M1 done:** #171 schema differential harness (closed; opt-in; 231 XSTS oracle disagreements pinned) + generative fuzz + validation framework (#92). ## XSTS gates (current enforced baselines) These mirror the ratchet asserted in `Tests/XSTSSuiteTests.swift`; update both together. | Gate | Now | Issue | |---|---|---| | Valid schemas rejected | 0 | [#148](https://github.com/mihaelamj/PureXML/issues/148) | | Invalid schemas accepted | 43 | [#145](https://github.com/mihaelamj/PureXML/issues/145) | | Valid instances rejected | 0 | [#146](https://github.com/mihaelamj/PureXML/issues/146) | | Invalid instances accepted | 31 | [#147](https://github.com/mihaelamj/PureXML/issues/147) | Gates are **metric trackers**, not implementation tasks. Pick up **task** issues; ratchet baselines in `Tests/XSTSSuiteTests.swift` when counts fall. ## Milestones | Milestone | Exit criteria | Key issues | |---|---|---| | M1: Trust the oracle | Reference differential + fuzz | ~~#171~~ (closed), fuzz | | M2: Schema compiles correctly | #145 to 0 | #161, #158, #159 | | M3: Instances validate correctly | #146, #147 to 0 | #172, #173, #174 | | M4: IDE-ready diagnostics | Located errors, proven bounds | #169 | | M5: 1.0 | All gates at 0 | #148 (closed at floor), #130, #139 | ## Labels | Label | Meaning | |---|---| | `epic` | Grouping issue | | `gate` | XSTS outcome metric | | `task` | Implementation work | | `area-schema` / `area-instance` / `area-infra` / `area-xslt` / `area-perf` | Subsystem | | `priority-P0` / `P1` / `P2` | Critical path vs parallel | ## Related docs - `docs/production-readiness.md`: the bar for IDE authority - `docs/schema-validity-burndown.md`: schema-side burn-down protocol - `docs/xsts-deviations.md`: deviation taxonomy and documented floors